Zenithtrevia
← كل الفرص

المعادن الصلبة ✓ Verified

Pilbara Iron Ore Offtake

Run by Pilbara Resources

Offtake against confirmed buyer contract

15%

projected, annualised · quoted as متوقَّع 15% سنويًا

Term
سنة واحدة
You get paid
ربع سنويًا
Minimum
$500
Liquidity
Locked
Structure
Fixed
45% funded of $200,000
Invest in this

السعر أعلاه توقّع مبني على خطة المشغّل ومراجعتنا لها — وليس عائدًا ندين لك به.

Due diligence

ما فحصناه.

9 of 9 checks passed against 1 document on file · last reviewed منذ 3 أشهر

  • ✓ Operator identity and registration confirmed Confirmed منذ 3 أشهر
  • ✓ Supporting documents supplied and legible Confirmed منذ 3 أشهر
  • ✓ Term, minimum and capacity are internally consistent Confirmed منذ 3 أشهر
  • ✓ Projected return is supported by the submitted plan Confirmed منذ 3 أشهر
  • ✓ Risk disclosures are complete and not understated Confirmed منذ 3 أشهر
  • ✓ Independently verified against a second source Confirmed منذ 3 أشهر
  • ✓ Mining licence current and in the operator's name Confirmed منذ 3 أشهر
  • ✓ Resource estimate reviewed Confirmed منذ 3 أشهر
  • ✓ Environmental permit in force Confirmed منذ 3 أشهر

كن صادقًا مع نفسك

ما الذي قد يسوء.

ننشرها نحن، ولا ندفنها نحن. هذه هي الطرق المحددة التي يخسر بها هذا المشروع بالذات المال.

Buyer default

Haulage disruption

Grade rejection at port

كل المخاطر، كاملةً

قد تكون أموالك تعمل الليلة.

افتح حسابًا في دقيقتين. موّله، اختر شيئًا، وتابع كل دولار فيه.